EV Charging
PROVIDING EXCEPTIONAL EV CHARGING SOLUTIONS
Electric Vehicle (EV) can be Level 1, Level 2 and DC fast chargers. EV permit shows the location of EV charger on the site plan. It includes a single line diagram for the EV charger.
This permit contains a general reference to the NEC or electrical code used in the jurisdiction. All work and installed equipment will comply with the requirements of the NEC or the electrical code used in the jurisdiction. The jurisdiction maintains the authority/responsibility to conduct any inspections deemed necessary to protect public safety. The charging station installer shall also be responsible for notifying or coordinating any work with the utility company where needed.
Site Layout with EVCS in the plan
Single Line Diagram
ROI generation
Adherence to the National Electrical Code or electrical code used in the jurisdiction
Manufacturer literature
Assurance of safety with respect to the installation
Get a Quote
Our in-house team of specialists will advise and support you from the initial design of your project to the commissioning process